4mo ago
Working on some mounting brackets These are gonna hold actual weight so they need to be sturdy.
Right now Im doing 60% infill with 4 walls Is that overkill or should I go higher?
Sign in to react to this post
This works
Good idea
I always do a temp tower first. Makes a huge difference in layer adhesion.
Sign in to join the conversation
Part of the Alfred van der Heide platform
Building tools that make life easier